ENS 491/ ENS 492 – GRADUATION PROJECT
PROJECT: CONSTURCTING A DATABASE – DATA ENVELOPMENT ANALYSIS
· Research on published articles about Data Envelopment Analysis ( DEA) between 1978 – 2009
· Determining paper details including author, journal, issue, pages, publisher, country, keywords, inputs and outputs
· Detailed analysis on the constructed bibliography
· Statistical analysis based on authors, topic, models etc.
· Individual Data Envelopment Analysis on “ Factors effecting Newspaper pres-run”
MS 405 – DECISION ANALYSIS
PROJECT: HOW CAN A STUDENT DECIDE ON HER MASTER PROGRAM?
· Determining alternatives, possible decisions, chance events and possible pay-offs
· A detailed decision analysis and choosing the best alternative
· Risk Analysis
· Sensitivity Analysis
MS 306 - ERGONOMICS
PROJECT: Ergonomic Design
MS 402 – INTEGRATED MANUFACTURING SYSTEMS
PROJECT: COMPUTER AIDED MANUFACTURING
· Computer Aided Design (CAD) of the product
· Computer Aided Manufacturing (CAM) of the product
· Error analysis
MS 309 - MANUFACTURING PROCESS
PROJECT: PRODUCTION OF WHEEL
· Determining production steps
· Factory visits
· Production of a steel wheel
MS 301 - DETERMINISTIC METHODS IN OPERATIONS RESEARCH
PROJECT: SCHEDULING
· Constructing a weekly Schedule for a school
· Determining objectives and constraints
· Mathematical Modeling
· Solution Approaches based on mathematical model of the problem using GAMS
MS 302 – STOCHASTIC METHODS IN OPERATIONS RESEARCH
PROJECT: CODING APPROACHES
· Constructing constructive and improvement algorithms for given cases
· Code writing in C++ and C # for corresponding algorithms
MS 409 - PROJECT MANAGEMENT
PROJECT: PROJECT MANAGEMENT
· Determining Early Start and Latest Start Schedules on a Given Case
· Application of different Project Management Approaches as using MsProject
MS 303 – DECISION ECONOMICS
PROJECT: ECONOMICAL ANALYSIS
· Determining Present, Future and Annual Values of a given case.
· Working on Interest Rates
· Determining Efficiency of Bonds
· Research on effects on Inflation, Deflation etc.
ENS 208 – INTRODUCTION TO MANUFACTURING SYSTEMS ENGINEERING
PROJECT 1: FORECASTING
· Constructing 2 year forecasts for USA’s 3 leading Technology Company: Microsoft, General Electric and Intel working on previous sales data from Dow Jones.
· Analyzing market sales
· Risk Analysis
PROJECT 2: INVENTING A BABY PRODUCT
· Deriving innovative ideas for a baby unit
· Research on companies specialized on Baby Products like Chico
· Inventing a baby unit, determine all relevant information about production
· Patent application
MS 304 - PRODUCTION AND SERVICE SYSTEMS PLANING AND DESIGN
PROJECT: FACTORY DESIGN
· Designing a factory from choosing a factory place to advertising stage
· 300 pages detailed report of the Project
MS 401- PRODUCTION AND SERVICE SYSTEMS OPERATIONS
PROJECT: PRODUCTION AND SERVICE SYSTEM OPERATIONS
· Forecasting
· Choosing the right production and service system
· Theoretical application of the systems
ME 301 – MECHANICAL SYSTEMS
PROJECT: CONSTRUCTING AN ASSEMBLY
· Technical Drawing and Computer Aided Design (CAM) for a gearing assembly
· Determining best material can be used in assembly
MS 482: SPECIAL TOPICS IN MANUFACTURING SYSTEMS
PROJECT: ANALYZING SUPPLY CHAIN OF VESTEL
· Research on Supply Chains
· Analyzing Vestel's internal and external supply chains and logistic systems
· Obtaining possible solutions for system problems
MS 430: LOGISTICS SYSTEMS AND MANAGEMENT
PROJECT: CONSTRUCTING A LOGISTICS SYSTEM
· Mathematical Modeling
· Determining where plant, warehouses and distribution centers will set up.
MGMT 201: INTRODUCTION TO MANAGEMENT
PROJECT: BUSINESS PLAN – OPENING A COFFEE SHOP IN BODRUM
· Area research
· Business Plan of the coffee shop
· Representation of the business plan and test on applicability
23 Nisan 2009 Perşembe
Kaydol:
Kayıt Yorumları (Atom)
Hiç yorum yok:
Yorum Gönder